At the wind turbine factory in Cuxhaven, ROBIN carried out extensive electrical installations on behalf of Siemens Gamesa. The work included low-voltage electrical installations, lighting and emergency lighting systems, cable containment and data cabling.
Siemens Gamesa’s Cuxhaven factory assembles key components for offshore wind turbines. The production facility is located directly beside the port, allowing the large, heavy nacelles to be shipped directly to offshore projects once completed. A factory covering approximately 55,000 square metres was built on a site of around 160,000 square metres. Its production processes are specifically designed for industrial manufacturing and efficient loading of wind turbine components.
The wind turbine factory was commissioned in 2017.
Photo: Siemens Gamesa
Siemens Gamesa
Cuxhaven (Germany)
2018
Low-voltage electrical installations, Lighting and emergency lighting, Cable containment, Data cabling