SynCon facility at Würgassen substation

Foto: Manfred Bues

At the SynCon system in Würgassen, ROBIN delivered extensive elements of the electrical building services and security systems on behalf of TenneT. This included low-voltage electrical installations, lighting and emergency lighting, data cabling and HVAC and instrumentation and control cabling, as well as work on the fire detection and alarm, intruder alarm and CCTV systems.

At Würgassen substation in Beverungen, a synchronous condenser, also known as a SynCon, stabilises the transmission network. The system consists primarily of a generator and a flywheel that stores large amounts of kinetic energy. In response to fluctuations, it can immediately provide an inertial response, absorb or supply reactive power, and increase the short-circuit power available in the network. It therefore performs important stabilising functions that increasingly need to be provided by other means as conventional power stations are shut down.

The system was commissioned in 2025.

Photo: Manfred Bues

End customer

TenneT TSO GmbH

Location

Würgassen, Beverungen (Germany)

Project completion

2025

ROBIN scope of work

Low-voltage electrical installations, Lighting and emergency lighting, Data cabling, HVAC and instrumentation and control cabling, Work on the fire detection and alarm, intruder alarm and CCTV systems