A high-capacity STATCOM system is being built at Würgau substation near Scheßlitz to stabilise the transmission network in northern Bavaria. The static synchronous compensator can absorb or supply reactive power almost instantaneously, dynamically compensating for fluctuations in grid voltage. This supports the secure integration of renewable energy and is becoming increasingly important as conventional power stations and their stabilising generators are progressively taken off the grid.
The system, supplied by HITACHI Energy, was connected to the extra-high-voltage network via a transformer weighing approximately 468 tonnes.
TenneT TSO GmbH
Würgau, Scheßlitz (Germany)
2025
Low-voltage electrical installations, Lighting and emergency lighting, Data cabling, HVAC and instrumentation and control cabling, Work on the fire detection and alarm, intruder alarm and CCTV systems