E-STATCOM facility, Mehrum

Foto Referenz Mehrum_ c Tennet TSO(1).jpg

For the E-STATCOM system in Mehrum, ROBIN delivered key elements of the electrical building services. This included low-voltage electrical installations, lighting and emergency lighting, cable containment, data and instrumentation and control systems, as well as the installation and cabling of fire detection and alarm, intruder alarm and CCTV systems.

At the Mehrum Nord substation in Lower Saxony, an innovative E-STATCOM system stabilises the transmission network. It combines the dynamic reactive power compensation of a STATCOM with a high-performance supercapacitor energy storage system. This enables it to respond to fluctuations within milliseconds, stabilise voltage and frequency, and partially compensate for the declining inertia provided by conventional power station generators. As the world’s first E-STATCOM in this configuration, the system, commissioned in 2025, makes an important contribution to the secure integration of renewable energy.

Photo: TenneT TSO GmbH

End customer

TenneT TSO GmbH

Location

Mehrum, Hohenhameln (Germany)

Project completion

2026

ROBIN scope of work

Low-voltage electrical installations, Lighting and emergency lighting, Cable containment, Data cabling, HVAC and instrumentation and control cabling, Installation and cabling of the fire detection and alarm, intruder alarm and CCTV systems

Zurück zur Übersicht