At the DolWin6 onshore converter station, ROBIN carried out a wide range of electrical building services work. In addition to low-voltage electrical installations, lighting, cable containment and data cabling, the scope of work included HVAC and instrumentation and control cabling, as well as work on the fire detection and alarm, intruder alarm and CCTV systems.
The DolWin6 onshore converter station is located at the Emden/Ost grid connection point. It forms the endpoint of the high-voltage direct current link, which is approximately 90 kilometres long. Here, the direct current converted on the DolWin kappa offshore platform is converted back into three-phase alternating current and fed into the extra-high-voltage network via the substation. With a transmission capacity of 900 MW, DolWin6 is an important part of the grid infrastructure connecting offshore wind generation in the German North Sea.
The station has been in operation since 2023.
Photo: TenneT TSO GmbH
TenneT TSO GmbH
Emden/Ost (Germany)
2022
Low-voltage electrical installations, Lighting, Cable containment, Data cabling, HVAC and instrumentation and control cabling, Work on the fire detection and alarm, intruder alarm and CCTV systems