For the BorWin5 onshore converter station, ROBIN carried out key work on the electrical and security systems. The scope of work included low-voltage electrical installations, lighting and emergency lighting, data cabling, HVAC and instrumentation and control cabling, as well as fire detection and alarm, intruder alarm and CCTV systems.
BorWin5 connects the He Dreiht offshore wind farm in the German North Sea to the onshore transmission network. On the BorWin epsilon converter platform, the 66 kV alternating current supplied by the wind turbines is converted into direct current and transmitted via a cable route approximately 230 kilometres long to the Garrel/Ost converter station. There, it is converted back into alternating current and fed into the extra-high-voltage network.
By connecting the wind farm directly to the converter platform, BorWin5 eliminates the need for a separate offshore substation platform. The grid connection system has a transmission capacity of 900 MW and was completed at the end of 2025.
Photo: Tennet TSO
Tennet TSO GmbH
Garrel/Ost (Germany)
2026
Low-voltage electrical installations, Lighting and emergency lighting, Data cabling, HVAC and instrumentation and control cabling, Fire detection and alarm systems, Intruder alarm systems, CCTV systems